Progress Q2 and Proposed List of Finishes Q3

Four (!) finishes in Q2 2019 from my Finish Along List for Q2.

Finished

Wallet “Grete” No. 2

Wallet "Grete" No. 2 | mell-meyer.de

This was my first finish: A long overdue wallet for my colleague. You can read more about it in this post.

Gemstone Tumbler

Gemstone Tumbler "Precious" | mell-meyer.de

And a very colorful baby quilt as the second finish. This project was almost on time :) All the details and many more pictures of this color goodness are in this post.

Plussquared

Plussquared | mell-meyer.de

And here is a finish for myself. The second quilt I am keeping. Here is the link to the post.

Greyscale – Meadowland No. 2

Meadowland No. 2 "Greyscale" | mell-meyer.de

I am adding quilts to my own pile! As always the details in the post.

And then I had two small in between finishes | And see what also happened :)

Did I finish as much as I had hoped for. Definitely not but that was to be expected. I always overestimate what I can get accomplished, especially when I count in vacation time :)

But I am on a good track and very happy about it. See for yourself:

Projects

All my current WIPs

"Ocean Waves" | mell-meyer.de
No. 1 – Ocean Waves
(since Q2/2016)

Binding
Started big stitch hand binding because all attempts to machine bind it failed. Totally unusual and very new for me but so far I like it!

EADS Quilt | mell-meyer.de
No. 2 – EADS Quilt
(since Q2/2018)

Resumed making blocks
now 88/165 done

Fabric Selection "Whirly Girl" | mell-meyer.de
No. 3 – Whirly Girl
(since Q3/2017)
"Good Wishes" | mell-meyer.de
No. 4 – “Good Wishes”
(since Q3/2017)

Planning
I started some block plannig but then got distracted again. But at least some small progress.

Proposed List of Finishes "Wanta Fanta" | mell-meyer.de
No. 5 – Wanta Fanta Quilt
(since Q3/2016)
Plusquilt | mell-meyer.de
No. 6 – Plusquilt
(since Q1/2017)
"Four Patch" | mell-meyer.de
No. 7 – Four Patch Quilt
(since Q3/2018)
Bee Quilt 2019 | mell-meyer.de
No. 8 – Bee Quilt 2019
(Q1/2019)

Layout
Started working on a layout. You can see the start here. Now considering on point :)

"Add Jewels" Meadowland No. 1 | mell-meyer.de
No. 9 – “Add Jewels”
(Q1/2019)

fabric reorder arrived
Meadowland No. 1
19/20 blocks done

No. 10 – Computer Grete
(not started)

fabrics selected
gift for my IT guy :)

No. 11 – Beach bag
(not started)

NEW
fabrics selected
“order” from my Mom

No. 12 – Jungle Quilt
(not started)

NEW
fabrics selected
I am tempted to write my own pattern and host a Sew Along.
Will keep you up to date :)

My Goal for 2019 is to get my WIP list down to 3-6 projects.

I am still not managing two finishes a month but I am getting the number down! This quarter I finished four and added “only” two. So far from originally 15 down to 12. Yeahh!

No. (1) Ocean Waves, (3) Whirly Girl are relatively close to a finish. And (10) the wallet is soooo long overdue. Also I think (11) the bag will be a not too complicated project. So I am hoping for lots of finishes in Q3. With three in Q1 and four Q2 it should be five now, right?

Best wishes
xo Melanie

Linking up at
Finish Along Q3 2019 @ She Can Quilt

3 Comments

Share Your Thoughts

I love to hear from you! I read and appreciate all your comments and will respond to you via email, a comment here or by visiting your blog. Or a combination of the above. So thank you for leaving an awesome comment!

Shopping Cart
Scroll to Top